Hi,
I am scheduling a .bat at 9.00 am to load a text file in a table A in SQL Server 2000 database. If this load is successful, I want to trigger another .bat file to execute a store proc.
Can I do this dependency based scheduling in SQL Server Scheduler and if so, can you give me details (references, books) as to how it can be done?
Thanks in advance
ShekI'd create a job with a couple of job steps. SQL server Books Online has info on sp_add_job and sp_add_jobstep. You can use XP_CMDSHELL to execute the bat files within the job steps.|||The job scheduler supports multipule tasks within one job. You can specify what action should be taken based on the success or failure of a task.
I susspect you could work through this just by setting up a test job in the job scheduler. Books Online, SQL Server Help, has a good writeup on this.
Look up "jobs" in the index. Also within jobs scan down to the sub topic of steps.
Showing posts with label bat. Show all posts
Showing posts with label bat. Show all posts
Subscribe to:
Posts (Atom)